Pale stone residential entrance with black-framed glass, a dark wood lobby and a copper-leaved maple in a raised stone planter.

The Eddy's Last Weekend, and What Happens to the Sierra Street Riverbank After It

November 5, 2026

Crews from RTC Washoe won't close the Sierra Street Bridge until early 2027. Even so, the first business on its banks will shut its gates this Sunday, November 8. The Eddy, the shipping-container beer garden at 16 S. Sierra St. on the Truckee Riverwalk, is closing for good after ten seasons, the Reno Gazette Journal reported.

The bridge project has already reshaped the corner where Sierra Street crosses the river. For anyone who walks the Riverwalk, floats the whitewater park, or meets friends on the west end of downtown, the next 18 months or more will be shaped by a timeline RTC has already published. The Eddy is just the first place where you can see it.

Two Nights Left on the Lawn

The Eddy kicked off its final week on Sunday, November 1 with Cafetón and the A.P. Run Club. The morning started with a group run on the boardwalk, followed by specialty coffee, DJs, and reggaetón once the doors opened at 11 a.m. That leaves the weekend:

  • Saturday, November 7, 6 to 9 p.m.: Braap Bash, the annual season kickoff party for Lake Tahoe Snowmobilers. According to the Sierra Avalanche Center's event listing, SAC will have a table there with information about its motorized avalanche education courses. The listing doesn't give an admission price.
  • Sunday, November 8: The Eddy's last day.

The venue's FAQ lists hours of 11 a.m. to 10 p.m. Sunday through Thursday and 11 a.m. to 1 a.m. on Fridays and Saturdays, and closing time can shift depending on the crowd. The same page still describes Season 10 as running from March through December 2026. With the closing announcement, that season now ends about two months early.

A Closing Set by a Calendar That Hasn't Started Yet

When it was announced in 2017, The Eddy was billed as Reno's first shipping-container park: an outdoor beer garden with bocce, art, farmers markets, and food trucks, according to KUNR's coverage at the time. Nearly a decade later, owners Kurt Stitser and Phil Buckheart posted a statement about the closing, which News 4 published in full. It names two reasons. One is "the negative business impacts looming from RTC's Sierra Street Bridge project slated to run April 2027 thru Summer 2028." The other is the terms offered for renewing the ground lease.

The bridge is still open, so the closing was decided on the strength of a schedule. The owners also wrote that they hope to "resurface somewhere else in the future," and KOLO's report covers the same two reasons. As of the closing announcement, no new use for the 16 S. Sierra St. site had been made public.

The Schedule the Riverbank Now Runs On

The bridge itself dates to 1937. RTC says it is safe but has outlived its typical lifespan, and maintenance can no longer keep up with its structural condition. The RTC project page shows design at 100 percent and construction expected in spring 2027. The most detailed timeline is in the handout RTC distributed at its August 2026 pop-up event:

Timing What happens at Sierra Street
Early 2027 Utility work begins; bridge stays open with minor traffic control
March 2027 Bridge closes; active construction starts on the northern supports
July to October 2027 In-river work
Early July 2027 Demolition of the northern section of the bridge begins
Late July 2027 Demolition of the southern section begins
Winter 2027 to 2028 Large horizontal support beams, called girders, are placed
2028 Anticipated completion, weather permitting

RTC's closure date is March 2027, about a month before the "April 2027" in The Eddy's statement. The handout also notes that the project "could extend beyond the anticipated completion date." The project FAQ explains the uncertainty. RTC uses an estimate of 18 to 24 months to set public expectations, while its designer and contractor look at refinements that could cut construction to 12 to 18 months. In-channel work is limited to July 1 through October 31 to protect federally protected fish species, though permitting agencies may allow extra time depending on river flows. If flows get too high, crews have to pull out of the floodway until the river drops.

For a downtown resident, that means the corner could see disruption over more than one summer. RTC expects in-water work to happen within that July-to-October window "for up to 2 consecutive years."

Where You'll Get Out of the River

The whitewater park is where the change will be most noticeable on a hot afternoon. The FAQ says most of the park sits upstream of Sierra Street and stays accessible. Recreation is restricted inside the construction zone, and people won't be allowed under the bridge. During construction, signs will direct river users to these exits, in this order:

  1. The concrete ramp at the east end of Wingfield Park, just below the north channel's #4 drop structure.
  2. West Street Plaza, where stairs lead down into the river at that same drop structure.
  3. City Plaza, also known as Believe Plaza, downstream of the bridge, which will serve only as an emergency exit for anyone who can't get out upstream.

If you float from Wingfield and usually ride the current past Sierra Street before getting out, plan to get out sooner while the work is underway.

The Plaza Next Door Was Already Off the Table

City Plaza had already come up in The Eddy's story earlier this year. On May 21, 2026, Buckster LLC, doing business as The Eddy, submitted a proposal to lease, with an option to buy, City Plaza at 30 N. Virginia St. and an adjacent Redevelopment Agency parcel. The plans included a bar and lounge, a food-truck court, a pizza restaurant, pickleball courts, a children's area, and a stage.

As This Is Reno reported on July 1, the proposal was withdrawn that same day. A memo from the city manager explains that City Plaza is designated in city code as a public plaza and as a space for First Amendment expressive activity. Those designations made commercial leasing or a sale legally difficult. The adjacent parcel didn't carry the same designations.

So the river frontage on both sides of Sierra Street was in play this year. The upstream site is losing its tenant, and the downstream plaza stays public. That's the same plaza RTC will rely on as an emergency river exit while the bridge is being rebuilt.

What the New Bridge Gives Back

RTC's design is a two-span, Art Deco-inspired bridge meant to match the look of the corridor. Most of the changes help people on foot:

  • Sidewalks widen from roughly 8 feet to 10 feet, with overlook areas.
  • Riverwalk crossings get bulb-outs at both ends of the bridge, and the north-side Riverwalk crosswalk gets flashing lights.
  • The south-side crosswalk shrinks from about 50 feet to 40 feet. West-side parking goes away to improve sight lines, and the bridge is designed for the 20 mph limit in the pedestrian safety zone the city set up on Sierra Street in 2022.
  • The river take-out moves to the southeast corner. It will be an ADA-compliant ramp, 6 feet wide between the handrails, reaching out about 7 feet past the bridge face. Grouted rock underwater will guide boaters to it, with an eddy-out feature near the exit.
  • The southwest corner gets a gated, maintenance-only ramp so city crews can back a truck down and clean the Cochran Ditch inlet without using a crane.

The FAQ also points to the city's Wingfield and Barbara Bennett Parks master plan. It includes a future in-water path from the new Sierra Street ramp back up to Wingfield Park, so river users could return upstream without crossing the street.

Who Is Still on the Bank

For businesses along the work zone, RTC's FAQ says the closure areas have been adjusted to keep key spots open to pedestrians, and the contractor has to post wayfinding signs and signs encouraging people to support local businesses. The project uses federal money, and the FAQ explains that under the federal Uniform Act, RTC does not pay adjacent businesses for lost revenue.

These are the spots within a short walk of the bridge that were open earlier this year:

  • Sierra Tap House at 253 W. 1st St. celebrated its 20th year on the river with a block party in May, KOLO reported.
  • The Spot, at 50 N. Sierra St. #106 on the Truckee River path, took over the address where Smee's used to be, according to its Riverwalk District listing.
  • Toro Bravo at 50 N. Sierra St. #104, Pizanos Pizza at 95 N. Sierra St. #102, and Liberty Food & Wine Exchange at 100 N. Sierra St. all appear in Edible Reno-Tahoe's Summer 2026 downtown guide.
  • Wild River Grille held its riverside dinner-concert series through September, FOX Reno reported.
  • The Shore at the Renaissance Reno Downtown posted an October 2026 calendar of happy hours and Bar Ritual events.

Winter hours on the river can change, so it's smart to check each spot before you head over. The next date on the Riverwalk is Saturday, November 21. The Riverwalk District calendar lists Rush the River from 8 a.m. to 5 p.m. with local food and shopping, plus the monthly Wine Walk from 2 to 5 p.m. for $30.

Sierra Street is getting a new bridge and new routines along with it. If you're thinking about where you want your home base downtown while the bridge is rebuilt, Jena Lanini knows these blocks of the Riverwalk and would love to help you find a spot that suits the way you live here. Discover Elevated Living. Start Your Search.

Let’s Find Your Dream Home

Jena Lanini crafts refined real estate experiences with strategy, heart, and unmatched local insight. From Reno to Lake Tahoe, trust her to navigate your next move with clarity and confidence.